LRT

The Valley Line LRT is a 27-kilometre, low-floor, urban line that will run from Mill Woods to Lewis Farms, crossing through downtown. There will be a stop in Cloverdale, beside the Muttart Conservatory.
The Valley Line will be built in multiple stages, with the 13-kilometer southeast portion being built first. Phase one of the Valley Line will run from downtown to Mill Woods and will feature:
- 11 street-level stops.
- An elevated station with a 1,400-spot Park and Ride facility and a full transit centre located in the Wagner industrial area.
- The new Tawatinâ Bridge across North Saskatchewan River.
- A short tunnel from the north face of the River Valley through to the quarter’s redevelopment.
- An interchange point at Churchill Square to access the existing Metro and Capital LRT lines.
Link for more information:
https://www.edmonton.ca/projects_plans/transit/future-lrt-projects.aspx
